Mortar preparation, ready for use at the consumption point, at the foot of the work (pressure process)

In this case, underneath the silo there is a set of pneumatic transport equipment allowing it to be pumped to where it is to be used on site, even up, to distances of up to 40-50m in height. In this way it is discharged on the small hopper of the corresponding automatic mixer which, as in the previous case, prepares the fresh mortar by mixing it with water in a controlled manner.